Gas Processing Plant GPPII: INTELS leads the consortium including Helios Investments (Helios Energy Transition Infrastructure Fund), The African Finance Corporation and JonMoore International awarded the concession to finance, build operate and transfer The Republic of Ghana’s second gas processing plant of 300 mmscf/d capacity for Ghana National Gas Company.
Special Economic Zones Gas Infrastructure: Intels has two Concessions for the establishment, development and O &M for gas infrastructure in the Ghana Free Zones Authority 2,300 Acre Export Processing Zone/MPIP in Takoradi-Ghana and the 1,200 acre Export Processing Zone/MPIP in Tema, Ghana
CNG / Turn-Key Gas to Power Solution: Intels is developing two CNG mother stations in Ghana to serve CNG to Industrial customers and is also developing Gas to Power solutions for some selected bottling Plants in Accra and Steel Factories.
Gas Reception Infrastructure and LNG Terminals (FSRU): Intels leads a consortium made up of itself and Progas Investments in the development of an FSRU project in the district of Inhassoro, Province of Inhambane FSRU project, Mozambique
BUNKERING and STORAGE: Intels / IsildurEnergy / International Marine Services (Mauritius) PTY Ltd is developing and constructing a 50,000 MY bunkering and storage infrastructure in Port Louis , Mer Rogue under partnership with International Marine Services (MAURITIUS) PTY limited as bunkering services for Marine Fuels under a 25 year port concession from the Mauritius Port Authority.
Engineering, Procurement, Construction, Installation, Pre-commissioning, Commissioning and Start-Up of Pressure Regulating Skid &Outlet (ESDV 23012) Bypass system for the Ghana National Gas Company Takoradi Distribution Station.
Engineering, Procurement, Construction, Integration, Commissioning and Performance Testing of one (1) set each of a HIPPS package complete with its accessories to be installed at the TDS for Ghana National Gas Company Limited
Pre-Commissioning Mechanical Audit &Pre-Commissioning Works for the TEMA LNG project. Leak Testing for Piping and Tie-Ins for TLNG and VRA &Purging of 6.5 km on shore pipeline
Pre- Commissioning works for the Tema LNG project
Sea water Intake Piping Survey/Assessment and EPC Works on the sea water intake Pipe for the Volta River Authority-Ghana
FEED and Engineering design for LNG Truck and Barge Loading Terminal and Infrastructure for ECOW GAS limited
FEED, Detailed Engineering Design works for 1.8 Km 6″ Pipeline and Associated Pressure Regulating and Metering System for Ghana National Gas &Marco Polo Tile Group, China
Pre-FEED/FEED Design works for 12″ Twelve km Pipeline from Hujimbre to Awaso Bauxite Enclave, Western Region for The White Rhino Group.
FEED &Feasibility for LPG/White and Black Fuels Loading Gantry for Divicor Limited – Tema Oil Refinery
FEED and conceptual studies for full Construction, Installation, Operations and Maintenance of Water Distribution system for Messrs Divicor Consortium, Ghana Free Zones Authority and Ghana Water Company Limited